Projects

Project Details

  • Client: Rainham Steel
  • Location: Scunthorpe, North Lincolnshire
  • Value: £1.6M

Project Description

JemBuild’s second successive contract with Rainham Steel, a £1.6m 26 week scheme to construct a 10,000m² triple bay triple bay warehouse extension to an existing steel storage warehouse at the Scunthorpe distribution centre.

Works also included the provision of a laser levelled reinforced concrete floor slab, the installation of a new LED lighting system both internally and externally, the installation of three overhead cranes, a syphonic drainage system, external drainage, the construction of external concrete perimeter roads and additional storage areas.


Discover More JemBuild Projects

CRODA CHEMICALS - CIVIL WORKS

DISCOVER MORE

PERISHABLE HUB BUILDING

DISCOVER MORE