Projects

  • ABP Canopy Extension- JemBuild

    Shed 5 Canopy Extension, King George Dock, Hull

    The design and construct of a new 80m x 20m canopy extension to the existing shed in line with a previous extension. This fast track project had to be carried out with minimum disturbance to the clients tenant who operate a very busy timber distribution company within the core of this busy dock.  Continued access […]

  • Baysgarth School – New Skills Centre

    Demolition of existing on site buildings to make way for a traditionally built high level single storey building to provide mechanical and hairdressing workshop spaces together with training areas, administrative and teaching areas and toilets. Externally the construction of a new car park, external hard landscaping works and the provision of incoming services supplied directly from […]

  • Refurbishment of School Kitchens

    The full refurbishment/renewal of seven primary school kitchens over the summer holiday period involving significant demolition and remodelling works in a congested environment.  The new kitchens were fitted with hygienic wall cladding, new flooring, hygienic ceilings, mechanical and electrical renewal and the supply of all kitchen equipment. A condensed programme that uncovered a significant amount of […]

  • e-Factor New Enterprise Village

    The largest development in Grimsby for over 20 years providing approximately 42,000sqft of new business incubation units. These consist of 25 light industrial/workshop units varying in size between 1100-3000 sqft, 9 incubation offices, a managed office space complete with associated roadways, site infrastructure, car parking and landscaping. Additionally, significant rainwater harvesting and drainage attenuation schemes have […]

  • PC World, Clifton Moor, York

    The provision of this new PC World store in York offers 30,000sqft of new shop floor on Clifton Moor Retail Park. A Design & Build contract consisting of a structural steel frame with cavity wall / composite cladded walls and inner roof. A mansard clay pantile roof has been incorporated on the full perimeter in keeping […]

  • Today’s Extra

    The conversion and 250m2 extension of a small convenience shop to a mini-supermarket for ‘Nisa/Today’s Extra’ including the incorporation of a ‘Subway’ and ‘Costa Coffee’. Works also included the conversion of derelict rooms at first floor level providing further living accommodation. The site is located at a very busy roundabout junction and this coupled with a […]

  • John Leggott College – Reception and Main Entrance Refurbishment

    A fast track refurbishment project to transform the reception of John Leggott College dividing the whole area into four key zones; passage, exhibition, welcome and meet, with each zone being a different colour to incorporate the college’s brand colours. Coloured rubber flooring was laid which extended to wrap up each adjacent wall which also provided […]

  • Signs Express – New Business Unit

    The refurbishment of an existing 300m2, two-storey building creating new offices and a manufacturing facility.

  • Kingeo Substation - JemBuild

    Associated British Ports – Kingeo Substation

    The project consisted of the construction of a major substation to power the new Siemens wind turbine facility on Alexandra Dock in Hull. Built off a reinforced concrete raft foundation with an internal  raised concrete floor on metal deck supported by internal blockwork walls forming the duct and cable trenches.  External walls were traditional masonry […]

  • Grimsby Crematorium - JemBuild

    Grimsby Crematorium Woodland Burial Ground

    The works involve the provision of a Woodland Burial Area within the existing Grimsby crematorium and cemetery grounds. Generally works consist of a new car park, a car park access road along with associated drainage, fencing and landscaping works.

  • ABP - Immingham Lockgates - JemBuild

    Associated British Ports – Immingham Lockgates

    The design and provision of a bespoke storage area for the support of 2no. 150 ton Lock Gates. Works included the excavation and of the existing area, drainage/ducting installation, the removal of an existing sheet piled wall, the installation of heavy duty reinforced concrete foundations and support walls complete with 300mm x 600mm timber sleepers, […]