Projects

  • John Leggott College – Reception and Main Entrance Refurbishment

    A fast track refurbishment project to transform the reception of John Leggott College dividing the whole area into four key zones; passage, exhibition, welcome and meet, with each zone being a different colour to incorporate the college’s brand colours. Coloured rubber flooring was laid which extended to wrap up each adjacent wall which also provided […]

  • Signs Express – New Business Unit

    The refurbishment of an existing 300m2, two-storey building creating new offices and a manufacturing facility.

  • Kingeo Substation - JemBuild

    Associated British Ports – Kingeo Substation

    The project consisted of the construction of a major substation to power the new Siemens wind turbine facility on Alexandra Dock in Hull. Built off a reinforced concrete raft foundation with an internal  raised concrete floor on metal deck supported by internal blockwork walls forming the duct and cable trenches.  External walls were traditional masonry […]

  • Grimsby Crematorium - JemBuild

    Grimsby Crematorium Woodland Burial Ground

    The works involve the provision of a Woodland Burial Area within the existing Grimsby crematorium and cemetery grounds. Generally works consist of a new car park, a car park access road along with associated drainage, fencing and landscaping works.

  • ABP - Immingham Lockgates - JemBuild

    Associated British Ports – Immingham Lockgates

    The design and provision of a bespoke storage area for the support of 2no. 150 ton Lock Gates. Works included the excavation and of the existing area, drainage/ducting installation, the removal of an existing sheet piled wall, the installation of heavy duty reinforced concrete foundations and support walls complete with 300mm x 600mm timber sleepers, […]