Projects

  • New Lock Gate Foundations, Grimsby

    New foundations were required to allow the lock gates to be stored on when not in use. The project consisted of excavation and laying subbase to received concrete foundations which was 2 individual reinforced concrete slabs both with 2 no 600mm wide support walls on each. 12 x 12 timbers where fitted to the tops of […]

  • New Siemens Site Compound (Green Port)

    Works to construct a 3200m2 compound on Alexandra dock Hull to house new modular office buildings and car parking spaces for ABP staff managing the development of the Green Port. The works included; intercepting and installing new services – Electric, Water, Telephones, foul and surface water drainage, excavating & re-grading levels to new falls with […]

  • Newton Garth

    Works to create a new habitat for wintering birds over 37 Hectares of existing farmland, farmland will be returned to meadow with areas lowered to form wetlands. The works included the formation of 2 no wader scrape areas (10000m2 total) adjacent to a central ditch firstly by removing topsoil and storing on site, the reducing subsoil […]

  • Cemex Relocation

    This project was carried out to allow the relocation of the Cemex Concrete Plant from Alexandra Dock to Albert Dock in Hull to make way for the new Siemens Plant. Works included the diversion of the existing main dock access road South by 20m, the new road was constructed over a distance of 180m long overall […]

  • Relocation of Lockgates

    The design and construction of a bespoke storage area for the support of 2no. 150 ton Lock Gates. Works included the excavation and of the existing area, drainage/ducting installation, the removal of an existing sheet piled wall, the installation of heavy duty reinforced concrete foundations and support walls complete with 300mm x 600mm timber sleepers, surfacing […]

  • ABP - Goole Transit Sheds - JemBuild-cover

    Associated British Ports, Goole – 18 & 20 Transit Sheds

    Generally the works comprise of the refurbishment of two large transit sheds (Sheds 18 and 20) which included (although not exhaustive) the removal of existing timber cladding (18 Shed), re-cladding works, the installation of new roller shutter doors, cladding improvements, new internal partition walls, drainage works, construction of a concrete dwarf walls to the perimeter of […]

  • ABP Canopy Extension- JemBuild

    Shed 5 Canopy Extension, King George Dock, Hull

    The design and construct of a new 80m x 20m canopy extension to the existing shed in line with a previous extension. This fast track project had to be carried out with minimum disturbance to the clients tenant who operate a very busy timber distribution company within the core of this busy dock.  Continued access […]

  • Baysgarth School – New Skills Centre

    Demolition of existing on site buildings to make way for a traditionally built high level single storey building to provide mechanical and hairdressing workshop spaces together with training areas, administrative and teaching areas and toilets. Externally the construction of a new car park, external hard landscaping works and the provision of incoming services supplied directly from […]

  • Refurbishment of School Kitchens

    The full refurbishment/renewal of seven primary school kitchens over the summer holiday period involving significant demolition and remodelling works in a congested environment.  The new kitchens were fitted with hygienic wall cladding, new flooring, hygienic ceilings, mechanical and electrical renewal and the supply of all kitchen equipment. A condensed programme that uncovered a significant amount of […]

  • e-Factor New Enterprise Village

    The largest development in Grimsby for over 20 years providing approximately 42,000sqft of new business incubation units. These consist of 25 light industrial/workshop units varying in size between 1100-3000 sqft, 9 incubation offices, a managed office space complete with associated roadways, site infrastructure, car parking and landscaping. Additionally, significant rainwater harvesting and drainage attenuation schemes have […]

  • PC World, Clifton Moor, York

    The provision of this new PC World store in York offers 30,000sqft of new shop floor on Clifton Moor Retail Park. A Design & Build contract consisting of a structural steel frame with cavity wall / composite cladded walls and inner roof. A mansard clay pantile roof has been incorporated on the full perimeter in keeping […]

  • Today’s Extra

    The conversion and 250m2 extension of a small convenience shop to a mini-supermarket for ‘Nisa/Today’s Extra’ including the incorporation of a ‘Subway’ and ‘Costa Coffee’. Works also included the conversion of derelict rooms at first floor level providing further living accommodation. The site is located at a very busy roundabout junction and this coupled with a […]