Projects

  • The Academy (TAG) Phase 3

    The Phase 3 internal refurbishment of the former Grimsby Art College providing increased Academy facilities including additional classrooms, a dance studio, care room, laboratory, stores, sixth form facilities, office and corridor refurbishments thus extending the current academy learning facilities. The Academy was occupied by students and staff throughout the works except for the holiday periods.

  • GIFHE - JemBuild

    Grimsby Institute

    A 12 week fast track project involving significant alterations to and refurbishment of the Grimsby Art College existing to create new academy learning facilities, including major structural alterations to existing load bearing walls, design and build new mechanical and electrical services, the provision of 4 new toilet blocks, a new sports hall, new library, engineering […]

  • Franklin College - Courtyard Building - JemBuild

    Franklin College – New Courtyard Building

    This RIBA and LABC award winning building new two storey Reception building has become ‘The new face of Franklin’. The project also involved the remodelling of the existing Reception and Student Services areas of the college along with associated external works. The new courtyard building is a steel frame construction clad in intricately detailed brickwork. […]

  • Humberston Park Special School - Jembuild

    Humberston Park Special School

    A £2.1 million project consisting of the construction of a series of single storey buildings that link into the existing school, all having a separate function which include classrooms and a sixth form block and linked through a glazed circulation area all with associated external works. Materials were a key consideration in the design process […]

  • Franklin College – F Block Refurbishment

    The internal remodelling of the layout, replacement of existing windows and external doors, alterations to the electrical small power, lighting and data installations, alterations to the existing heating system, replacement of floor finishes, replacement of ceiling finishes and redecoration to rooms and corridor, provision of a new meeting room and four classrooms.

  • Franklin College – G Block Refurbishment

    A £500k project consisting of the extensive internal refurbishment of the existing ICT Management Suite (Block G) over a six week period. The works generally comprised of the full internal demolition works which involved the removal of all internal walls/doors, lighting, ceiling, fixtures and fittings and the construction of new walls (built to a new […]

  • North Lindsey College – New Roof to Gymnasium

    The installation of a single ply roof system to the existing John Oddell Building at North Lindsey College. All works carried out within term time.

  • Rainham Steel – Gantry Construction

    JemBuild’s first contract with Rainham Steel, a £1.7m 34 week scheme to construct 3no. 120m long steel gantries at the Rainham Steel distribution centre in Scunthorpe. Formed in 1973 Rainham are the UK’s foremost independent Steel Stockholder and Distributor. The company specialises in the supply of Universal Beams, Universal Columns, Channels, Angles, Large Flats and […]

  • Rainham Steel – Warehouse Extension

    JemBuild’s second successive contract with Rainham Steel, a £1.6m 26 week scheme to construct a 10,000m² triple bay triple bay warehouse extension to an existing steel storage warehouse at the Scunthorpe distribution centre. Works also included the provision of a laser levelled reinforced concrete floor slab, the installation of a new LED lighting system both […]

  • Croda Chemicals – Civil Works

    JemBuild dual contract award from Croda International. The initial award of a £1.2 million project is the first step in a £27m investment of the global chemical giant announced recently at the companies Oak Road site in North Hull. The scheme involves the construction of a significant new road structure and associated drainage within a […]

  • Perishable Hub Building

    A 12000 sqft Perishable Hub Building located at Humberside International Airport provided to relocate European Terminals from a smaller unit within the Airport grounds to this new site to enable the increase of air freight through the airport offering economic benefits to both Humberside Airport and European Terminals. The new bespoke building offers direct access to […]

  • Baggage Handling facility

    The construction of a new baggage handling facility at Humberside International Airport. Works involved the supply of a new insulated steel framed building, electrical/heating works, flooring and decoration along with the  removal of the existing facility following completion of the new facility.