Projects

  • North Lindsey College – New Roof to Gymnasium

    The installation of a single ply roof system to the existing John Oddell Building at North Lindsey College. All works carried out within term time.

  • Rainham Steel – Gantry Construction

    JemBuild’s first contract with Rainham Steel, a £1.7m 34 week scheme to construct 3no. 120m long steel gantries at the Rainham Steel distribution centre in Scunthorpe. Formed in 1973 Rainham are the UK’s foremost independent Steel Stockholder and Distributor. The company specialises in the supply of Universal Beams, Universal Columns, Channels, Angles, Large Flats and […]

  • Rainham Steel – Warehouse Extension

    JemBuild’s second successive contract with Rainham Steel, a £1.6m 26 week scheme to construct a 10,000m² triple bay triple bay warehouse extension to an existing steel storage warehouse at the Scunthorpe distribution centre. Works also included the provision of a laser levelled reinforced concrete floor slab, the installation of a new LED lighting system both […]

  • Croda Chemicals – Civil Works

    JemBuild dual contract award from Croda International. The initial award of a £1.2 million project is the first step in a £27m investment of the global chemical giant announced recently at the companies Oak Road site in North Hull. The scheme involves the construction of a significant new road structure and associated drainage within a […]

  • Perishable Hub Building

    A 12000 sqft Perishable Hub Building located at Humberside International Airport provided to relocate European Terminals from a smaller unit within the Airport grounds to this new site to enable the increase of air freight through the airport offering economic benefits to both Humberside Airport and European Terminals. The new bespoke building offers direct access to […]

  • Baggage Handling facility

    The construction of a new baggage handling facility at Humberside International Airport. Works involved the supply of a new insulated steel framed building, electrical/heating works, flooring and decoration along with the  removal of the existing facility following completion of the new facility.

  • Runway HD Drainage Works

    The installation of 150lm of HD Gatic drainage complete with three manholes on taxiway 2 at Humberside Airport complete with the removal of the existing runway drainage channels. Works carried out between the hours of 8pm-5am in a highly sensitive and controlled area subject to strict FOD guidelines.

  • Runway Resurfacing

    The 9000m2 full plane out and resurfacing of the main taxiway. All works carried out between 10am and 5am over a five-day period.

  • Centre4 - Cover Image - JemBuild

    Centre4

    A 26 week project comprising the refurbishment of a former secondary school together with multiple single storey extensions and associated external works to form the new Centre4 Community Centre.  Centre4 (formerly Second Avenue Resource Centre) was established in 1995 and exists to support the regeneration of North East Lincolnshire.  It is a vibrant Hub that offers services […]

  • New Lock Gate Foundations

    Working in partnership with Ravestein Marine this project involved the construction of foundations to facilitate the new lock gates to the largest port (by tonnage) in the UK.  Works were demanding, harzardous and very challenging on site working directly on the lock side between daily live shipping movements. Four 150m3 foundations complete with 80 tons of […]

  • ABP – Flood Defence Works

    Our largest project awarded by Associated British Ports, Immingham the largest port (by tonnage) in the UK. As part of ABP’s Humber flood defence strategy contract the works involved the provision of new infrastructure to facilitate the installation of larger lock entrance gates. Works included the installation of 5km of ducting, major drainage and service […]

  • Goole Hoist ABP Cover

    Associated British Ports – No.5 Boat Hoist Refurbishment

    JemBuild are pleased to have been awarded this interesting restoration project in the Port of Goole on this Grade 2 listed Boat Hoist building. Works comprised of an extensive scaffolding design and erection offering access to the 8.5m high platform level to facilitate the removal of existing rotten timber joists, the installation of new timber […]