Projects

  • Runway HD Drainage Works

    The installation of 150lm of HD Gatic drainage complete with three manholes on taxiway 2 at Humberside Airport complete with the removal of the existing runway drainage channels. Works carried out between the hours of 8pm-5am in a highly sensitive and controlled area subject to strict FOD guidelines.

  • Runway Resurfacing

    The 9000m2 full plane out and resurfacing of the main taxiway. All works carried out between 10am and 5am over a five-day period.

  • Centre4 - Cover Image - JemBuild

    Centre4

    A 26 week project comprising the refurbishment of a former secondary school together with multiple single storey extensions and associated external works to form the new Centre4 Community Centre.  Centre4 (formerly Second Avenue Resource Centre) was established in 1995 and exists to support the regeneration of North East Lincolnshire.  It is a vibrant Hub that offers services […]

  • New Lock Gate Foundations

    Working in partnership with Ravestein Marine this project involved the construction of foundations to facilitate the new lock gates to the largest port (by tonnage) in the UK.  Works were demanding, harzardous and very challenging on site working directly on the lock side between daily live shipping movements. Four 150m3 foundations complete with 80 tons of […]

  • ABP – Flood Defence Works

    Our largest project awarded by Associated British Ports, Immingham the largest port (by tonnage) in the UK. As part of ABP’s Humber flood defence strategy contract the works involved the provision of new infrastructure to facilitate the installation of larger lock entrance gates. Works included the installation of 5km of ducting, major drainage and service […]

  • Goole Hoist ABP Cover

    Associated British Ports – No.5 Boat Hoist Refurbishment

    JemBuild are pleased to have been awarded this interesting restoration project in the Port of Goole on this Grade 2 listed Boat Hoist building. Works comprised of an extensive scaffolding design and erection offering access to the 8.5m high platform level to facilitate the removal of existing rotten timber joists, the installation of new timber […]

  • ABP – Sheds 8, 9 & 10

    The refurbishment of three 75,000sqft bulk stores with works comprising of general brickwork repairs, drainage works, retaining wall construction, provision of palisade fencing, cladding works and the supply and installation of 9no. 6m x 6m roller shutter doors.

  • St Joseph’s View, Cleethorpes

    This contract involved the construction of a 5-storey residential apartment block on a constricted site in the middle of a busy residential street close to Cleethorpes town centre. Traditionally built in brick/block cavity walling resting on a 1st floor 400mm thick concrete reinforced slab offering the support for the main building and also forming the roof […]

  • Penistone Fire and Ambulance Station

    Relocation of the existing Fire and Ambulance Stations in Penistone was required due to Dransfield. Properties procuring their existing site or the construction of a new Tesco Store in central Penistone. The construction of new Fire and Ambulance Stations was carried out on the large site of the existing council depot. This Design & Build […]

  • Grant Thorold Library

    The main library building was constructed utilising insulated concrete wall formers thus reducing the thermal loading of the building with this wall then supports a ‘living wall’ housing some 12,000 species of plants to create a building that blends into its park surroundings, the first of its kind in Lincolnshire. The new building provides an […]

  • Bradley Pitches Sports Facility

    Construction of a new state of the art sports facility with the provision of an irrigated, floodlit full size natural Premier pitch with seating, one full size fully floodlit 3G synthetic pitch to both Football Association and Football Foundation specifications and the remodelling of the existing  football pitches, the new pavilion/changing rooms consisting of new player changing […]

  • Trinity West Bus Stop Relocation

    The S278 works included the relocation of several City Centre Bus Stops to facilitate the new Trinity West shopping centre construction. Works had to be carried out in a timely logistical and detailed manner to allow for minimum disruption to the public and Metro (Leeds Bus Service). Works involved the excavation of existing carriageway sections, the […]