Project Description

The design and provision of a bespoke storage area for the support of 2no. 150 ton Lock Gates. Works included the excavation and of the existing area, drainage/ducting installation, the removal of an existing sheet piled wall, the installation of heavy duty reinforced concrete foundations and support walls complete with 300mm x 600mm timber sleepers, surfacing works, external lighting tower modifications and the installation of palisade fencing to the full perimeter of the new site.

Project Details

Client:Associated British Ports
Location:Immingham Docks
Value:£100k